Texas City Hurricane Flood Protection
Download Data
CSV
GeoJSON
GeoPackage
Location City, County, and State of the levee system. Determined by the levee alignment location not the leveed area.
Texas City, Galveston County, Texas
System ID Unique identifier code for the levee system using 10 or 12 numbers in length.
3105000004
Operation and Maintenance Organization Entity responsible for day-to-day management of the levee.
Galveston County, TX
Floodplain Management Entities responsible for regulating activities that occur in areas prone to flooding.
FEMA Region 6
Oversight Organization Entity responsible for oversight of the levee and ensuring it is maintained.
USACE - Galveston District
Last Assesment Date Last Risk Assessment or Formal Inspection.
4/30/2018
Levee Length Combine length of all the levee system features including the embankments, floodwalls, closures where they exist for this system.
Levee Length Graphic 22.002 Miles
Average Levee Height The average height of the levee system. The levee profile viewer on the mapping window will show the actual levee height values for the length of the levee if available.
Levee Height Graphic 20 Feet
Year Levee Constructed Year levee system was fully completed as a flood reduction project.
Timeline Graphic 1987
Summary General text description of the levee system with a summary of why the levee is there, and the benefits it provides.
The Texas City and Vicinity Hurricane Flood Protection (HFP) was originally constructed in 1930, and later expanded as part of the federally authorized project between 1962 and 1987. The system is approximately 22 miles long consisting of 20.6 miles of levees and 1.35 miles of flood wall. To secure crossing points for the system there are 18 closure structures in the form of double swing gates, single swing gates, and 1 tide control gate. There are 25 gravity structures and 2 pump stations to assist in removing water from the interior area. The system reduces risk for approximately 45,000 people living and working in the cities of Texas City, La Marque, and the surrounding vicinity. Additionally there is $4 billion in property value of commercial, residential, public property, and $20 billion worth in petrochemical industry within the leveed area of the system. After the completion of construction, the HFP was turned over to Galveston County Judges Office (public sponsor) to be maintained and operated.
Performance & Condition General text description of the historical and anticipated performance of the levee, the people and property benefitting from the levee and who may be at risk of flooding, and actions to address areas of concern.
The risk associated with this levee system is considered very high. For the Texas City and Vicinity HFP the record surge loading occurred during Hurricane Ike. The north eastern portion of the system was loaded to 100% of the levee’s height while other sections were only loaded 50% of height. A storm surge larger than what occurred during Hurricane Ike would most likely overtop the levee system. Since Hurricane Ike a section of floodwall has shown signs of movement, and is expected to fail prior to the system being overtopped. Inundation of the area could result in some localized flood depths up to elevation 15 feet. This flooding has a potential for loss of life, and economic damages to critical infrastructure including the internationally significant petrochemical industry.
Flooding Hazard
Historic Loading by Percentage of Height
Info Bubble Representative loading associated with historical flood information as a percentage of the levee height or overtopping.
Loading by Percentage of Heigth Graphic Background 0 Occurrences 1 Occurrences 5 Occurrences 9 Occurrences